industrial-wastewater-treatment-supplier-in-uae
We are proud to be associated with currently world’s most popular destination address- “Neom-The Line”.

We successfully executed Effluent Treatment Plant of capacity (ETP). It was a challenging project considering certain specific site demand but hats off to our technical team to make it possible with ease.

Scope of work involved design, supply, delivery, installation and commissioning of ETP. The capacity of plant is 800 cubic meter per day

The raw water comprised wastewater from mountain tunnel drilling.

We also provided 3 months of free operations support to acquaint client with plant operations. AKWT also got opportunity to supply odor control units at sewage treatment plant at another location in Neom.